Our staffs have been pioneers in environmental monitoring technology in Hong Kong and have experiences in auditing worldwide:
Environmental Monitoring
![]() |
First in Hong Kong to conduct territorial-wide survey of fine suspended particulates using saturation samplers where strictest quality assurance requirements were met |
![]() |
Ambient air quality measurement and source NOx measurements for Tai Po Gas Production Plant |
![]() |
Ambient air quality monitoring at Cheung Chau |
![]() |
Southeast Kowloon re-development (Kai Tak Airport demolition site) air quality monitoring |
![]() |
Indoor air quality surveys for commercial offices and recreational hall |
![]() |
Radon measurement for Indoor living space |
![]() |
Environmental monitoring for the property development projects meeting EIA Ordinance and HKBEAM requirements such as development of the Former Marine Police Headquarters, urban renewal project at Shaukeiwan, etc. |
![]() |
Hydrogen sulphide measurement for sewage pumping station on Lantau Island |
![]() |
Measurement of NOx levels in chimneys of a waste recycling factory in Fanling and ambient NOx impact due to the chimneys |
![]() |
Public Transport Interchange air quality survey |
![]() |
Water quality monitoring for ash lagoon operation, coal jetty extension work at Lamma island |
![]() |
Sea water thermal survey plan and measurement of the water temperature rise due to condenser cooling water discharge |
![]() |
Territorial-wide background noise survey and measurement of traffic noise for EPD |
![]() |
Measurement of noise around garment manufacturing factory |
![]() |
Survey of train noises |
![]() |
Noise monitoring for events and rehearsals in Hong Kong Stadium and Kowloon Tsai Park. |
![]() |
Occupational Health noise & air quality assessment for weaving and printing factory, and container vessel |
![]() |
Monitoring of possible bird collision for first commercial wind turbine electricity generating unit in Hong Kong |
Environmental Audits and Checker Services in Hong Kong
![]() |
Independent Environmental Checker for Decommissioning of the Former Kai Tak Airport other than the North Apron |
![]() |
Independent Environmental Checker for Hong Kong Convention And Exhibition Centre Atrium Link Extension |
![]() |
Environmental audits of electricity transmission and distribution facilities |
![]() |
Environmental audits for development of the Former Marine Police Headquarters |
![]() |
Environmental audits of water treatment works |
![]() |
Environmental audits of drainage improvement construction works |
![]() |
2x350MW coal-fired units and ash lagoon of Lamma Power Station (total capacity 3305MW) |
![]() |
Northeast New Territory (NENT) landfill environmental compliance audit |
![]() |
Environmental audit for Hei Ling Chau Correctional Services |
![]() |
Independent Environmental Checker for Sheung Shui Slaughterhouse noise control design |
![]() |
Independent Environmental Checker for Construction of 132kV transmission line from Po Lam Substation to Tui Min Hoi Substation (Circuit No. 2) |
![]() |
Independent Environmental Checker for Lamma Power Station operations and Independent Verifier of Lamma Power Station Air Emissions |
![]() |
Independent Environmental Checker for Lamma Power Station navigation channel improvement |
![]() |
Independent verification of EMSD environmental reporting |
![]() |
Sample laboratory analysis Quality Assurance Service for Cheoy Lee Shipyard Phase II Site |
![]() |
Decontamination/Remediation |
![]() |
Indoor air quality certification and re-certification for Tao Heung Restaurant Group, Hong Kong Film Archive, commercial bank & other commercial complexes |
Environmental Monitoring & Audits Overseas
![]() |
2x362KW coal-fired Meizhou Wan Power Station at Fuzhou (Fujian Province, China) |
![]() |
2x125MW coal-fired power station in Jiaozuo Wan Fang Power Company Limited (Henan Province, China) |
![]() |
Hefei Power Station consisting of 2x38MW gas turbines plus 4x125MW coal-fired units (Anhui Province,China) |
![]() |
Wuhu Power Station consisting of 6x125MW coal-fired units (Anhui Province, China) |
![]() |
Coal-fired units of Guangzhou Zhujiang Power Plant of Guangzhou Development Industry (Holdings) Co., Ltd. (Nansha, China) |
![]() |
LNG-fired units of Guangzhou Nansha Development Gas Co., Ltd. (Nansha, China) |
![]() |
Environmental, health & safety (EHS) audit for Seagate Technology Inc. (disk drives assembly and components plants) in Singapore, Malaysia, Indonesia, Wuxi and Shenzhen of China |
![]() |
Audit for environmental aspect identifications for a garment manufacturing factory in Macao |
![]() |
Environmental audit for Shanghai Johnson Ltd. in Shanghai, China |
![]() |
Air sampling for investigation of objectionable odour from river at Dongguan, China |
![]() |
Feasibility study on the setting up a monitoring network to monitor air quality impact from power stations in Macau Special Administrative Region |
![]() |
Stack measurement of particulate, NOx, SO2, TVOC and CO emission from chemical factory in Macau |
Nature & Technologies (HK) Limited
Lot 12, Tam Kon Shan Road, North Tsing Yi, New Territories, Hong Kong
Tel: +852 2877 3122
Fax: +852 2511 0922
For enquiry of our services, please contact us at the numbers above or by email.
For questions regarding this web site, please contact the webmaster.